( ex. – 1,600 CFM moved outside the building in a single weekend. )

List project stats below.

If a field below doesn’t apply enter “n/a”.

( ex. 1,600 CFM )
( ex. 40 FT Enclosure )
( ex. 1 Weekend )
( ex. – The plant had outgrown a compressor room wedged between two production lines. Heat was rejecting into the workspace, service access required shutting down a cell, and there was no room left for the capacity the next contract demanded. )
( ex. – We scanned the room and the exterior tie-in area, then designed a modular enclosure sited on a new pad forty feet from the wall. The unit was built, wired, and tested in the shop, set with a crane, and cut over during a scheduled weekend shutdown. The vacated room became staging space. )

System Specifications

If a field below doesn’t apply enter “n/a”.

( ex. – 2 × 200 hp VSD rotary screw )
( ex. – Cycling refrigerated, 1,800 SCFM )
( ex. – 1,060 gal vertical, exterior )
( ex. – Coalescing + particulate, dual stage )
( ex. – 40 ft insulated modular, weather rated )
( ex. – Thermostatic exhaust fans, wall louvers )
( ex. – 4 in aluminum header, 3 in tie-in )
( ex. – 480 V / 3 ph, in-enclosure distribution )

Build Timeline

List project build details and milestones. Example weekly notes below.

Week 1 – Scan and Assessment

Point cloud of compressor room, exterior wall, and pad location.

Weeks 2-3 – Design Approval

CAD layout and equipment selection reviewed with plant engineering.

Weeks 4-9 – Shop Build

Enclosure fabricated, equipment set, piping and electrical completed.

Weeks 10 – Factory Test

Controls, ventilation, and leak testing verified before shipment.

Weeks 11 – Set and Cut-Over

Crane set Saturday, tie-in and start-up complete by Sunday night.